PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Securing the shear wall panels at Elev.4-Stair -2 Facing South-West (800x600).jpg Welding the steel arch at Derrick -2 (2nd Floor) Facing East (800x600).jpg Bolting the steel arch at Derrick -2 Facing North (800x600).jpg Compacted soil inside Stair -4 pit Facing East (800x600).jpg Manholes Facing South (800x600).jpg Placing manhole by the bridge Facing Cherry Street (800x600).jpg Underground roughing along column line 2.5 from G-K Facing West (800x600).jpg
Previous pageNext page Manholes Facing South (800x600)
Manholes Facing South (800x600)